• Hollow Wall Slab Formwork for Concrete Shuttering Building Construction Instead Plywood
  • Hollow Wall Slab Formwork for Concrete Shuttering Building Construction Instead Plywood
  • Hollow Wall Slab Formwork for Concrete Shuttering Building Construction Instead Plywood
  • Hollow Wall Slab Formwork for Concrete Shuttering Building Construction Instead Plywood
  • Hollow Wall Slab Formwork for Concrete Shuttering Building Construction Instead Plywood
  • Hollow Wall Slab Formwork for Concrete Shuttering Building Construction Instead Plywood

Hollow Wall Slab Formwork for Concrete Shuttering Building Construction Instead Plywood

After-sales Service: Reuse 80-100 Times
Warranty: 5 Years
Certification: ISO, ROHS, CE
Samples:
US$ 10/Piece 1 Piece(Min.Order)
| Order Sample
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
Hollow Wall Slab Formwork for Concrete Shuttering Building Construction Instead Plywood pictures & photos
Hollow Wall Slab Formwork for Concrete Shuttering Building Construction Instead Plywood
US $15-20 / pieces
Min. Order: 200 pieces
Diamond Member Since 2023

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory, Trading Company
  • Overview
  • Product Description
  • Our Advantages
  • Company Profile
  • Certifications
  • Packaging & Shipping
  • FAQ
Overview

Basic Info.

Model NO.
MTM12/15/18
Material
Plastic
Type
Slab Formwork
Raw Material
PP
Normal Size
1220X2440X18mm
Use
Construction
Customize
Yes
Color
Grey or Black
Reuse Time
80-100 Times
Waterproof
100%
Cost
Save 50% Than Plywood
How Use
Can Cut, Nail and Screw
Transport Package
Pallet
Specification
1220x2440x18mm-21mm
Trademark
MTM
Origin
China
HS Code
39259000
Production Capacity
6000 Pieces /Day

Packaging & Delivery

Package Size
244.00cm * 122.00cm * 20.00cm
Package Gross Weight
30.000kg

Product Description

 
Product Description
Hollow Wall Slab Formwork for Concrete Shuttering Building Construction Instead Plywood
Hollow Wall Slab Formwork for Concrete Shuttering Building Construction Instead Plywood
Hollow Wall Slab Formwork for Concrete Shuttering Building Construction Instead Plywood


The material is Polypropylene,the melting point can be as highas 167°C. PP Vicat softening temperature of 150°C. Heat-resistant, corrosion-resistant products available,have a stronger impact strength.

The surface stiffness and scratch resistance are very good. 95% Polypropylene plus our patented formula to suit the international construction standard. The formwork Bearable temperature is -20~90 °C.
Size (mm) Thickness(mm) Weight(KG)/PC Qty(pcs)/20ft Qty(pcs)/40ft
1220x2440 12 23 560 1200
1220x2440 15 26 440 1050
1220x2440 18 31.5 400 880
1220x2440 21 34 380 800
1250x2500 21 36 324 750
500x2000 21 11.5 1078 2365
500x2500 21 14.5 / 1900
Hollow Wall Slab Formwork for Concrete Shuttering Building Construction Instead Plywood
Hollow Wall Slab Formwork for Concrete Shuttering Building Construction Instead Plywood
Our Advantages
1.REUSABLE FOR 80-100 TIMES
plastic formwork is tested to achieve a minimum 80 cycles repeated usage of concrete casting.
2.100% WATER PROOF
plastic formwork is weather-resistant, rain and shine is no longer an issue of formwork quality.
3.NO RELEASE OIL REQUIRED
The surface is formulated with additives that makes the board superior in withstanding acidic or alkaline
environment.
No demoulding oil is required and dismantling of formwork is always easy.
4.HIGH WORKABILITY
User-friendly, work well with saw, nail, drill, cut, tec. Compatible with other materials such as wood, steel,
aluminum, etc.
5.LIGHT WEIGHT
It is lighter, easier to carry and relieve worker from heavy labor.

1.REUSE 80-100 TIMES; 100% WATERPROOF.
Hollow Wall Slab Formwork for Concrete Shuttering Building Construction Instead Plywood
Hollow Wall Slab Formwork for Concrete Shuttering Building Construction Instead Plywood
2. WATER CAN CLEAN THE SURFACE.
Hollow Wall Slab Formwork for Concrete Shuttering Building Construction Instead Plywood
Hollow Wall Slab Formwork for Concrete Shuttering Building Construction Instead Plywood

3 .HIGH EFFICIENCYHollow Wall Slab Formwork for Concrete Shuttering Building Construction Instead Plywood
4.SAVE COST
Hollow Wall Slab Formwork for Concrete Shuttering Building Construction Instead Plywood5 . HIGH TEMPERATURE RESISTANCE
Polypropylene raw material the melting point can be as high as 167 °C PP Vicat softening temperature of 150 °C
Hollow Wall Slab Formwork for Concrete Shuttering Building Construction Instead Plywood
COMPARISON OF VARIOUS FORMWORK
Hollow Wall Slab Formwork for Concrete Shuttering Building Construction Instead Plywood
Company Profile

 


Hebei Mortmain Rubber & Plastic Technology Co., Ltd. is a large-scale professional plastic products company with registered capital RMB20,000,000. It is located in CANGZHOU CITY, HEBEI PROVINCE . We now have 108 employees,include 23 technicist,16 administrative staff and sales. Our company hollow plastic construction formwork products of our company have been evaluated by the National Building Materials testing Center as "Green Building selection products" selected into the CTC Green Building selection Product Guide catalogue.
And has passed the CE certification, ISO9001, Turkey international testing certification.
We have export 15 years more than 100 countries with 3 rent companies. And cooperate with more than 10 trading companies with 5 agent warehouse in China .
Certifications

 

Packaging & Shipping

Projects
 


Visiting
FAQ

1. who are we?
We are based in Hebei, China, start from 2009,sell to Domestic Market(40.00%),Eastern Asia(20.00%),South Asia(20.00%),Mid East(15.00%),Africa(5.00%). There are total about 51-100 people in our office.

2. how can we guarantee quality?
Always a pre-production sample before mass production;
Always final Inspection before shipment;

3.what can you buy from us?
formwork,construction formwork,plastic formwork,pp formwork,concrete formwork

4. why should you buy from us not from other suppliers?
Factory price, Stable high classic quality, Guaranteed delivery time

5. what services can we provide?
Accepted Delivery Terms: FOB,CFR,CIF,EXW,FCA,DDP,DDU;
Accepted Payment Currency:USD,EUR,JPY,CAD,AUD,HKD,GBP,CNY,CHF;
Accepted Payment Type: T/T,L/C,D/P D/A,MoneyGram,Credit Card,PayPal,Western Union,Cash;
Language Spoken:English,Chinese,Hindi

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

From payment to delivery, we protect your trading.
Hollow Wall Slab Formwork for Concrete Shuttering Building Construction Instead Plywood pictures & photos
Hollow Wall Slab Formwork for Concrete Shuttering Building Construction Instead Plywood
US $15-20 / pieces
Min. Order: 200 pieces
Diamond Member Since 2023

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory, Trading Company
Registered Capital
30000000 RMB
Plant Area
101~500 square meters